Quote4Removals
 

Commercial - Case Study

Mr Hollingshead - Farm Bulding - Cheshire

Installation Platform
South Facing Position
Steel Corrugated Roof - Pitched Roof

Items Installed
240 Watt - 200 Risen SYP240S Panels
STP 12000TL-10 - 4 Inverters
PV AC & DC Switch Generation Metre

Reasons for considering a solar install
The solar installation was to produce electricity in a converted farm building remote from regular energy supplies.

Reasons for using NGH Energy
Mr Hollingshead was impressed by the service offered by the sales contact and installation team. Installation costs proved to be very competitive.

How the installation was handled
The installation was completed in just a few days. The system was generating electricity immediately!

System performance
Solar Panel system generates 41,822kWh annually.

 


 

Farm Land - West Midlands

Installation Platform
South Facing Position
Farm Land (Panels to be mounted at pitch)

Items Installed
240 Watt - 200 Risen SYP240S Panels
STP 12000TL-10 - 1 Inverters
PV AC & DC Switch Generation Metre

Reasons for considering a solar install
To supplement energy supplies, reduce running costs and provide a steady return on investment.

Reasons for using NGH Energy
NGH provided a fabulous quote. The install was handled professionally with office support staff happy to provide ongoing assistance.

How the installation was handled
Installation was relatively easy as the system is entirely ground based. The install took little over two days to complete and has been providing good returns since it went live.

 


 

Walkers Chocolates Ltd - Birmingham - Commercial Building

Installation Platform
South Facing Position
Corrugated Roof - Factory - Pitched Roof (Panels to be mounted at pitch)

Items Installed
240 Watt - 375 Risen SYP240S Panels
STP 17000TL-10 - 5 Inverters
PV AC & DC Switch Generation Metre

Reasons for considering a solar install
The main aim of the solar installation was reduce the carbon footprint of the factory and at the same time cut the costs of energy bills.

Reasons for using NGH Energy
NGH Energy was found to offer one of the most competitive quotes.

How the installation was handled
Due to the number of panels required (375) the installation was carried out over several days. Panels were mainly frame mounted in order to achieve the desired angle.

System performance
Walkers Solar Panel system generates 80,659.70kWh annually (peak power 90,000kWh annually).

 
 
 
 
 
  I'd like to learn more about:
  Solar PV (Photovoltaic)
  Solar Hot Water (Thermal)
  Air/Ground Source Heat Pumps
  Biomass Boilers
 
© 2013 NGH energy - Part of Northern Gas Heating - the UK’s local supplier of Solar, Renewables & Central Heating Systems - Terms & Conditions